Jobs Undertaken - Vesselwise

[
Major
Towages Undertaken | Major
Charters Undertaken | Major
Jobs Undertaken - Vesselwise ]
ROMA
SNo |
Nature of Job |
Duration |
| 1 |
OPS in Sirri Island with NITC. |
10 months |
| 2 |
Towage of 5000 DWT Barge in support of pipe laying operations for Hyundai/Total at Iran (Khoramshah & Asaluyeh) |
5 months |
| 3 |
Anchor Handling & Towing/Supplying/other works in support of accomodation barge 'Kanta' on East Coast of India |
5 months |
| 4 |
For Dredging International for dredging survey and support of dredging operations at Jebel Ali Port (U.A.E.) |
4 months |
| 5 |
Support of towage operations in Qatar offshore Field for NPCC, Abu Dhabi (U.A.E.) |
45 days |
| 6 |
Towage of Dredger 'Colbart' and tug 'Guayas' from Abu Dhabi (U.A.E.) to Halul Qatar |
5 days |
| 7 |
Towage of MV 'Gulf Cooperation' - DWT 9083 MT - GRT 7729 - NRT 2968 MT - 135.7 M x 21 M x 11 M - Draft FW 2.7 & Aft 5.7 from Dammam Roads to Dubai Roads |
5 days |
| 8 |
Towage of Barge 'Safa 242' and tug 'Hima' from Abu Dhabi (U.A.E.) to Das Island (U.A.E.) |
2 days |
| 9 |
Towage of MV 'Gulf Cooperation' - DWT 9083 - GRT 7720 - NRT 2968 - 135.7 M x 21 M x 11 M - Draft FW 2.7 & Aft 5.7 from Ajman (U.A.E.) to Gadani (Pakistan). |
8 days |
| 10 |
Towage of Cargo Barge 'GTO X' - GRT 689 - LOA 45.7 M - Breadth 15.26 - Depth 2.95 M from Sharjah Roads (U.A.E.) to Bahrain |
3 days |
| 11 |
Towage of barges 'Pacific Ann' and 'DN 35' from Abu Dhabi (U.A.E.) to Iran. |
4 days |
| 12 |
Towage of barge 'Regina 250' from Kuwait to Abu Dhabi |
11 days |
| 13 |
Towage of Crane Barge 'Rodos' - GRT 782 - 48.30 x 20.00 x 3.00 M and T/B 'Al Morgan' - GRT 41 - 16.34 x 5.31 x 2.39 M from Ajman (U.A.E.) to Halul Island, Qatar. |
2 days |
| 14 |
Towage of Barge 'Parga' - GRT 263 - 36.00 x 12.00 x 2.40 M and T/B 'Fata Morgana' - GRT 60 - 15.75 x 4.85 x 2.30 M from Ajhan (U.A.E.) to Halul Island Qatar via Doha Port. |
7 days |
SEAWAYS 1
SNo |
Nature of Job |
Duration |
| 1 |
Towage of Barges from Persian Gulf to Sikka (India) |
5 months |
| 2 |
Port operations for Dubai Ports Authority at Jebel Ali, Dubai (UAE) |
36 months |
| 3 |
Port operations for Dubai Ports Authority at Port Rashid, Dubai (U.A.E.) |
24 months |
| 4 |
Port operations for DP World at Port Rashid Dubai (U.A.E.). |
In progress |
SEAWAYS 2
SNo |
Nature of Job |
Duration |
| 1 |
Towage of Bulk Carrier MV 'Breeze' - GRT 15166 - NRT 10574 - LWT 6899 - LT/Displacement Abt 12000 mts - LOA 175.84 M x Beam 25.4 M - Draft Abt. 2.8 - FWD Abt. 4.8 Aft. - Towage from Jebel Ali to Alang India. |
11 days |
| 2 |
Towage of Coaster Volna II (Split 5) - GRT 563 - NRT 168 mts. - LOA 49.6 M x Beam 9.00 M - Draft 1.2 M - Towage from Ajman Roads to Dabhol Roads. |
11 days |
| 3 |
Towage of Motor Vessel 'Million Profit' - LDT 7183 LT - LOA 181.3 M x Beam 25 M - Draft Abt 4 M - Towage from Hodeidah Yemen to Alang India. |
17 days |
| 4 |
In support of Titan for lifting of grounded barge 'Ahlia' and subsequent towage of wreck to deeper waters. |
4 months |
| 5 |
Towage of MV 'Napoca' (now 'Salem 1') - GRT 6047 - LDT 3700 tons - LOA 130.7 M x Beam 17.7 M - Max Draft Abt. 8 M - Loaded with 7500 tons of cargo. Towage from Colombo to Alang via Aden and Mukalla. |
2 months |
| 6 |
Towage of MV 'Global Pioneer' - GRT 12,440 - LOA 159 M - Beam 22.86 M - Draft FWD 4 M & Aft 6 M. Towage from Nacala - Mozambique to Dubai. |
1 month and 4 days |
| 7 |
Towage of MV 'Mariam' - GRT 2477 - LOA 91 m - Beam 13.80. Towage from 26 28 N - 056 10 E to Fujairah Roads. |
1 day |
| 8 |
Support of towage operations in Qatar Offshore Field for NPCC Abu, Dhabi (UAE) |
2 months |
| 9 |
Support of towage operations in Qatar Offshore Field for NPCC, Abu Dhabi (UAE) |
45 days |
| 10 |
Support of towage operation at Mumbai High for NPCC Abu Dhabi. |
3 months |
| 11 |
Support of towage operation in Qatar Offshore Field for MAERSK project. |
2 months |
| 12 |
Support of towage operation in Qatar Oilfield for NPCC project. |
4 months |
| 13 |
Support of towage operation for ADMA OPCO Offshore Gas Development Project |
6 months |
| 14 |
Towage of 'Pontoon DN 21 - GRT 334 - 37.4 M x 15. M - Draught - CA 0.8 M and 'Pontoon DN 22 - GRT 138 - 30.3 M x 9.35 M - Draught CA 0.7 M from Seychelles to Dubai, U.A.E. |
15 days |
| 15 |
Towage of Dipper Dredger 'Jerommeke' - GRT 256 - 48.50 x 15. 10 M - Height 10 M - Average Draught - 2.30 M from Ras Laffan, Qatar to Dubai, U.A.E. |
2 days |
| 16 |
34 days time charter for towage and assistance to barge 'GC 55' from Jebel Ali Port, Dubai to offshore Qatar. |
34 days |
| 17 |
Double Towage of Dipper Dredger 'Jerommeke' and Pontoon 'DN 17' - GRT 256/183 - 48.5M x 15.1 M/23.41M x 12.2M - Height 10M/2.45M - Average Draught About 2.3M/0.5M from Jebel Ali Port, Dubai to Ras Laffan, Qatar. |
2 days |
| 18 |
Towage of tubular steel cages containing live tuna fish within Mediterranean waters. |
70 days |
| 19 |
Towage of Laker 'Maple Glen' - GRT 17070 - Displacement Tonnage 26214 - LOA 218 - Beam 23 M - Max Draft 4 M approx from Montreal, Canada to Alang, India. |
3 months |
| 20 |
Towage of Derrick Lay Barge 'Regina 250' - GRT 5316 - NRT 1595 - LOA 94 - BEAM 26 - Depth 6.75 Metres - Draft 3.83 from Lat 01 40 South - Long 043 58 East to Port of Mukalla |
12 days |
| 21 |
Towage of MV 'Horizon' Bulk Carrier - GRT 11,099 - Light Displacement 4,800 MTS about - LOA 138.18 M - Beam 22.30 M - Draft 5 M max from Port Gentil to Mumbai |
2 months |
| 22 |
Support of towage operations in Qatar for OXY job. |
4 months |
| 23 |
Support of towage operations for ADMA OPCO Offshore Gas Development. |
2 months |
| 24 |
Support of towage operations within Arabian and UAE waters for NPCC charter. |
10 1/2 months |
| 25 |
Coated pipe transportation and other construction works to support Charterer's offshore project for Hyundai Heavy Industries/MUT pipeline project in India. |
2 1/2 months |
| 26 |
Support of towing cargo barges loaded with pipes from NPCC Marine Base, Mussafah to Mubarak Field for Crescent Project No. 4040 in Sharjah. |
3 months |
| 27 |
Towage of Barge 'Millennium 1' - GRT 2874 - Displacement Tonnage Approx 3,500 Tons - Length 62.40 M - Breadth 20.00 M - Draft 3.20 M from Hamriyah Port, Dubai, U.A.E to Midsea. |
8 days |
| 28 |
Towage of Motor Dry Cargo Vessel 'Maike-C' - GRT 5,688 - DWT 7,600 - Length 108.40 M - Breadth 18.20 M - Depth 17.40 M - Maximum Draft 6.65 M from Midsea to Salalah, Oman. |
3 days |
| 29 |
Towage of Barge 'GPM-240' - GRT 1874 - NRT 1527 - LOA 73.5 M - Breadth 24.3 M - Depth 4.87 M - Deadweight 5400 tons from Sharjah, U.A.E. to Mumbai, India. |
7 days |
| 30 |
Transportation of works to support Charterers (i.e. TTS International Dubai) projects in India. |
3 months |
| 31 |
Towage of Barge 'Capital 45-01'- GRT 1779 - NRT 534 - Light Displacement 784.78 Tons - LOA 76.20 - Beam 21.94 - Draft Approx 1.60 Mtrs. from Batam, Indonesia to Dubai, U.A.E. |
21 days |
| 32 |
Towage of Floating Crane Barge 'Huta 38' - GRT 689.96 - Light Ship 537 Tons - Length 40.00 M - Breadth 22.00 M - Moulded Dept 2.80 M - Draft Approx 0.70-1.20 M from Dammam, Saudi Arabia to Salman Bay, Saudi Arabia. |
20 days |
| 33 |
Towage of Tug 'Radhwa 1' - GRT 740.35 - Displacement Tonnage Approx 450 Tons - Length 43.50 M - Breadth 13.70 M - Draft 3.00 M. Towage from Yanbu Port, Saudi Arabia to Hamriyah Port / Dubai, U.A.E. |
18 days |
| 34 |
Towage of Passenger Ship 'Avicena' - GRT 5284 - NRT 4093 - LDT ABT 3500 - LOA 121.2 - BREADTH 16 - DEPTH 4.5 M - DRAFT FWD 2.3 M - AFT 2.7 M from Kuwait to Alang, India. |
12 days |
| 35 |
Towage of Chemical Tanker 'Springwind' - GRT 4,982 - NRT 2,626 - Displacement Tonnage - 5,000 MT - Length 109 M - Breadth 17.5 M - Draft Max 5 M from Chennai, India to Singapore. |
13 days |
| 36 |
Towage of Sand Carrier 'Goryo 3' - GRT 3,408 MT - LDT about 2,000 MT - LOA 89.3 - Breadth 20 - Depth 6.5 M from Batam, Indonesia to Chittagong, Bangladesh. |
12 days |
| 37 |
Towage of General Cargo Vessel 'MV Bumi Jaya' - GRT 7,809 MT - NRT 3,971 MT - DWT 10,480 MT - LOA 129.50 - Breadth 21.04 - Depth 10.50 Mtr - Draft About 8.00 Mtr from Chittagong, Bangladesh to Pasir Gudang, Malaysia. |
14 days |
| 38 |
Towage of Barge 'Seaways 14' - GRT 2620 - Displacement Tonnage 7273.99 Mt. - LOA 280 ft. - Breadth Moulded 80 ft - Draft 3.772 from Singapore to Ras Al Khaimah. |
34 days |
| 39 |
5 Months Coated Pipe Transportation and other Construction Works to support Charterers Offshore Project for Hyundai Heavy Industries/KOC Pipeline Project in Kuwait. |
5 months |
| 40 |
Towage of M.V. 'Navee' - GRT 13,442 - DWT 20,850 - Length 159.10 M - Beam 22.86 M - Maximum Draft 9 M from Shuwaikh Port, Kuwait to Port Rashid, Dubai. |
7 days |
| 41 |
Towage of 'Dredger II' Cutter Suction Dredger - GRT 309 - Length 56.00 M - Beam 11.00 M - Maximum Draft 2.00 M from Ratnagiri, India to Mundra, India. |
11 days |
| 42 |
Towage of Vessel 'PMS 48' - GRT 4835 - LOA 96.56 - Beam 30.48 M from Batam, Indonesia to Alexandria, Egypt. |
51 days |
| 43 |
Towage and Escort Duty of General Cargo Vessel 'Baltic Trader' - GRT 6,263 - DWT 7,908 - LOA 121.80 M - Beam 17.63 M - Max Draught 7.71 M from Lat 20.33.9 North ; Long 38.36.7 East to Jeddah Roads, Saudi, Arabia. |
2 days |
| 44 |
7 Months Support and Towage Operations at Offshore Qatar for NPCC Charter related to Qatar Gas and Maersk Oil Qatar Projects. |
6 1/2 months |
| 45 |
Towage of Rock Barge 'DN 123' - GRT 3712 tons - Length Abt 86.26 M - Breadth Abt 27.43 M - Draught Abt 1 M from Batam, Indonesia to Jebel Ali Dubai |
2 months and 2 days |
| 46 |
Towage of Roro Cargo Ship 'X-Press Makalu' - GRT 11,138 - Displacement 8,979 - LOA 137.15 M - Beam 25.28 M - Max Draught 3.5 M from Pattaya, Thailand to Alang, India. |
1 month and 23 days |
| 47 |
Towage of Bulk Cargo Barge 'Bulk Prosperity' - GRT 7,200 - DWT 10,500 - LDT About 3,500 - LOA 95.0 M - Beam 32.25 M - Depth 7.1 M from Nantong China to Mumbai Roads, India |
2 1/2 months |
| 48 |
Towage operations in Qatar oil field for NPCC porject. |
5 months |
SEAWAYS 3
SNo |
Nature of Job |
Duration |
| 1 |
Barge 'Ahlia' - In support of Titan for salvage operations, for lifting of grounded barge 'Ahlia'. |
4 months |
| 2 |
Transportation of bridges from Iran to Offshore location. |
90 days |
| 3 |
Transportation of Project Material/Equipment from Iran to Offshore location. |
30 days |
| 4 |
Transportation of Project Material/Equipment from Iran to Offshore location. |
12 months |
SEAWAYS 4
SNo |
Nature of Job |
Duration |
| 1 |
Towage of MV 'Bombay' - GRT 13731 - Displacement Approx 21000 mts. - LOA 161.58 M - Beam 22.84 M - Draft Approx 7 M. Towage from Male to Chittagong Bangladesh. |
21 days |
| 2 |
Anchor Handling Operation in support of HLS 2000 in South Pars Area (Iran) for NPCC Abu Dhabi, (UAE) |
3 months |
| 3 |
Anchor Handling Operation in Qatar Offshore for NPCC Abu Dhabi (UAE) |
4 months |
| 4 |
Anchor handling operation at Mumbai High for NPCC Abu Dhabi. |
3 months |
| 5 |
Anchor handling operation in Qatar Offshore Field for MAERSK project. |
2 months |
| 6 |
Anchor handling operation in Qatar Oilfied for NPCC project. |
3 months |
| 7 |
Anchor handling operation for ADMA OPCO Offshore pipe laying project. |
9 months |
| 8 |
Anchor handling operation in Iran for Shell Project. |
2 months |
| 9 |
Anchor handling operation in Qatar for MAERSK project. |
4 months |
| 10 |
Anchor handling operation for ADMA OPCO Offshore pipe laying project. |
4 months |
| 11 |
Anchor handling operation in Qatar for MAERSK project. |
1 1/2 months |
| 12 |
Anchor handling operation for ADMA OPCO Offshore pipe laying project. |
1 1/2 months |
| 13 |
Anchor handling operation in Qatar for OXY job. |
6 months |
| 14 |
Anchor handling operation for ADMA OPCO Offshore pipe laying project. |
3 months |
| 15 |
6 months Anchor Handling Operations for Hyundai Heavy Industries / MUT Project in Mumbai, India. |
6 months |
| 16 |
12 months Anchor Handling, Supplying, Towing and other Construction Works to support Hyundai Heavy Industries offshore Project / PTT Pipeline Project in Thailand. |
12 months |
| 17 |
6 Months Charter Party for towages of Barges from Singapore, Indonesia, Vietnam and Australia and back. |
6 months |
SEAWAYS 5
SNo |
Nature of Job |
Duration |
| 1 |
90 days time charter for towage of Barge 'Smit Anambas' - dimensions 114 M x 32 M x 6.8 M |
90 days |
| 2 |
90 days time charter for towage of barge 'Esprit' from Batam Indonesia to Dubai and back. |
90 days |
| 3 |
Towage of Accommodation Barge 'Sea Stallion' - DWT 5500 MTS - LOA 82 M x Beam 21 M x Depth 4.90 M x Max Draft 3.50 M from Mumbai Port, India to Sharjah Port |
09 days |
| 4 |
Towage of Motor Bulk Carrier 'New Wind' - GRT 27,039 - DWT 41,418 - LOA 189 M x Breadth 31.3 M x Depth 16.7 M x Draught Approx 10 M from 13 North 56 East about 100 Miles Off Socotra to Jeddah, Saudi Arabia. |
09 days |
| 5 |
Towage of Yacht 'Maria Kosmas' - GRT 3344 - NRT 1383 - LOA 97 M X BEAM 13.43 M X DEPTH 8.84 M X DRAFT 4.3 M from Tuzla (Turkey) Roads to Dubai Roads. |
1 month |
| 6 |
Double towage of Lakers 'Oak Glen' and 'Seaway Queen' - Each vessel approx: GRT - 17070 - Displacement Tonnage 26214 - LOA 218 - Beam 23 M - Max Draft 4 M approx from Montreal, Canada to Alang, India. |
4 months |
| 7 |
90 days time charter for towage of barge 'Esprit' |
90 days |
| 8 |
Six months time charter for towage of barge 'Labroy 199' |
6 1/2 months |
| 9 |
Escort or Towage (if required) of M. Livestock Carrier 'Al Messilah'- GRT 38,988 Tons - DWT 14,201 Tons - LOA 185.82 M - Breadth 32.03 M - Depth 13.17 M - Draught 8.0 M |
15 days |
| 10 |
Towage of M. General Cargo Vessel 'Gulhan Y' - GRT 6,253 - DWT 9,958 - LOA 125 M X BREADTH 18.7 M X DEPTH 10.4 M X DRAUGHT approx 8.4 M from Off Dakar, Senegal to Kantvik, Finland |
1 month and 4 days |
| 11 |
Towage of Cutter Suction Dredger 'Vlaanderen XIX' - GRT 2.970 Tons - LOA 99.90 M (Incl Ladder) - Hull Dims 75.00 - Breadth 18.55 M - Depth 5.95 M - Draft Abt 4.50 M from Tangier, Morocco to Doha, Qatar. |
1 month and 8 days |
| 12 |
Towage of Motor Bulk Carrier 'Pointing' Ex-'Satsang 1' - GRT 16,066 -LOA 176.75 M - Beam 22.86 M - Depth Mldd 14.10 M - DWT 26,175 - Draughts Fwd About 5 M - Aft Draught 8 M from approx 2500 nms from Dubai in directionf of Madagascar to Alang Port, India. |
26 days |
| 13 |
To tow tug, cargo barges and support offshore installation for the Charterers (i.e. Clough Projects International Pty Ltd) project in Panna Field, India for their Clients (BG Exploration & Production India Ltd). |
2 months |
| 14 |
Towage of Passenger Ship 'Blue Lady' - GRT 76,049 - Displacement Tonnage Approx 47,000 Tons - LOA 315.66 M - Moulded Breadth 33.70 M - Maximum Draft 10.70 M from Kelang, Malaysia to Alang, India |
4 months |
| 15 |
Towage of Barge 'Huta 72' - LOA 91.38 - Breadth 27.47 - Depth 5.86 M - DWT 10,128 from Yanbu, Saudi Arabia to Hamriyah Port, U.A.E. |
17 days |
| 16 |
Towage of Floating Crane 'Huta 39' - GRT 690 - Length 38.40 M - Breadth 22.02 M - Moulded Depth 2.68 M from Dammam, Saudi Arabia to Rabbigh, Saudi Arabia. |
30 days |
| 17 |
Double Towage of Chemical Tanker 'Delos' - GRT 7338 - Lightweight 3474 - LOA 142.42 M - Beam 18.62 M and General Cargo 'Transmar III' - GRT 5366 - Lightweight 3660 - LOA 121.90 M - Beam 12.02 M from Port Suez, Egypt to Alang, India. |
40 days |
| 18 |
One Year and six months Charter for Coast Guard Duties in the waters of U.A.E. and adjoining International Waters for "UAE Coast Guard". |
In progress |
SEAWAYS 6
SNo |
Nature of Job |
Duration |
| 1 |
Port operations for Dubai Ports Authority at Jebel Ali, Dubai (U.A.E.) |
24 months |
| 2 |
Port operations for DP World at Port Rashid, Dubai (U.A.E.) |
In progress |
SEAWAYS 7
SNo |
Nature of Job |
Duration |
| 1 |
Towage of Scrap Vessel 'Rio Negro' - GRT 21732 - LOA 197.5 M x Beam 27.6 M x 14.8 M - Summer Draft 10.9 from Rio de Janeiro, Brazil to Alang,India. |
2 months |
| 2 |
Anchor handling and towing operation in Iran for Shell project. |
3 months |
| 3 |
Double towage of Barge 'ASL 72' - GRT 860 - 52 x 17 x 3.50 M and Barge 'Ciomas' - GRT 259 - 36 x 12 x 2.50 M from Messaied, Qatar to Qalhat Anchorage, Oman. |
5 days |
| 4 |
Anchor handling and towing operation under Naft Sazeh Qeshm for Shell project. |
7 months |
SEAWAYS 8
SNo |
Nature of Job |
Duration |
| 1 |
Transportation of Project Material/Equipment from Iran to Offshore (Naft Sazeh Qeshm for Shell Project) |
7 months |
| 2 |
Transportation of Project Material/Equipment from Qatar to Offshore (for Oxy JOb) |
4 months |
| 3 |
Transportation of Project Material/Equipment from NPCC Abu Dhabi to Offshore (for Saudi Aramco) |
9 1/2 months |
| 4 |
Coated pipe transportation and other construction works to support Charterer's offshore project for Hyundai Heavy Industries/MUT pipeline project in India. |
2 1/2 months |
| 5 |
Transportation of pipe joints related to Crescent Project in Sharjah (NPCC Job No. 4040). |
1 1/2 months |
| 6 |
Assisting 'HLS-2000' campaign for Jackets Installation related to Oxy Project in Qatar Waters for NPCC Charter. |
17 days |
| 7 |
Transportation of works to support Charterers (i.e. TTS International Dubai) projects in India. |
3 months |
| 8 |
To support Charterers (i.e. Clough Projects International Pty Ltd) project in Panna Field, India for their Clients (i.e. BG Exploration & Production India Ltd). |
3 months and 4 days |
| 9 |
2.5 years charter to NPCC for various Offshore Projects in Arabian Sea and Arabian Gulf including Saudi Aramco. |
In progress |
SEAWAYS 9
SNo |
Nature of Job |
Duration |
| 1 |
30 days time charter for 2nd Anchor Handling Tug for Derrick Lay Barge (DLB) for the on-going installation of Offshore facilities and pipelines. |
2 months |
| 2 |
14 months Anchor Handling Operations for Hyundai Heavy Industries / Chunxiao Project in China. |
14 months |
| 3 |
Towage of Barge 'Giant 3'- GRT 2309 - NRT 693 - Length 73.74 M - Breadth 24.38 M - Depth 4.88 M from Singapore to Dubai. Dubai to Mumbai. Mumbai to Singapore. |
70 days |
| 4 |
4 months Anchor Handling, Supplying, Towing and other Construction Works to support Hyundai Heavy Industries Offshore Project in Vietnam. |
4 months |
| 5 |
Towage of Oil Storage Barge 'Cinta Natomas' - GRT 61,228 - LOA 602.50 ft. - Breadth 133.36 ft. - Depth 82.30 ft. - Fore 2.5 M - Aft 3.5 M from Batam, Indonesia to Tuban Offshore,Indonesia. |
9 days |
| 6 |
2 Months Anchor Handling, Supplying, Towing and other Construction Works to support Hyundai Heavy Industries Offshore Project / Rongdoi and PTT Project in Vietnam and Thailand. |
2 months |
| 7 |
Towage of Vessel 'Support Station 3' - GRT 6135 - Displacement Tonnage 1840 - Length 96.4 M - Breadth 24.4 M - Depth 6.10 M - Draft 3.875 M from Eastern Working Anchorage, Singapore to TG Unchang, Batam, Indonesia. |
1 day |
| 8 |
7 Months Towage of Barge 'Smit Borneo' and Anchor Handling Works to support Global Vessels Mauritius Ltd Project in Mumbai, India. |
7 months |
| 9 |
6 Months Towage and Anchor Handling Works to support J.Ray McDermott Middle East Offshore Project in Qatar for Qatar Gas and Kingdom of Saudi Arabia for Saudi Aramco. |
6 months and 13 days |
| 10 |
6 Months Towage and Anchor Handling Duties, in support of the Heavy Lift Vessel 'Stansilav Yudin' for charter to 'Seaway Heavy Lifting Contracting Limited'. |
In progress |
SEAWAYS 10
SNo |
Nature of Job |
Duration |
| 1 |
Anchor Handling operations with Barge 'Castoro 2' for Saipem project in Ras Laffan, Qatar. |
7 1/2 months |
| 2 |
Escort Duty for vessel 'Regulus Voyager' - GRT 160,036 - NRT 109,604 - LOA 333 - Breadth (Moulded) 58 - Depth (Moulded) 31.25 - DWT 310,106 from Oman to Fujairah, U.A.E. |
2 days |
| 3 |
9 Months Anchor Handling, Supplying, Towing and other Construction Works to support Hyundai Heavy Industries Offshore Project/KOC and PTT Project in Kuwait. |
9 monhts |
| 4 |
37 Days General FPSO support duties in Girassol and Dahlia Field off Luanda account TOTAL followed by 2 Years General 'FPSO Plutonio' support duties in Angola for British Petroleum Project of SMIT Terminals Europe Ltd." |
In progress |
SEAWAYS 11
SNo |
Nature of Job |
Duration |
| 1 |
Port operations for DP World at Port Rashid Dubai (U.A.E.)
|
In progress |
SEAWAYS 12
SNo |
Nature of Job |
Duration |
| 1 |
Anchor Handling, Supplying, Towing and other construction works to support Hyundai Heavy Industries project in Yadana oilfied for Total E&P, Myanmar followed by ADMA-OPCO's Umm Shaif Gas Injection Facilites (USGIF) project. |
In progress |
SEAWAYS 14
SNo |
Nature of Job |
Duration |
| 1 |
4 Months Coated Pipe Transportation and other Construction Works to support Charterers Offshore Project for Hyundai Heavy Industries/KOC Pipeline Project in Kuwait. |
4 months |
| 2 |
Offshore Construction Works for NPCC Projects in Arabian Sea and Arabian Gulf. |
One year |
SEAWAYS 15
SNo |
Nature of Job |
Duration |
| 1 |
Towage of Barge 'PMS 42' - GRT 4835 - Length 96.56 M - Beam 30.48 M - Draft F-0.95M, M-0.95M, A-0.95M from Batam, Indonesia to Suez. |
37 days |
| 2 |
Towage of Derrick Lay Barge 'Regina 250' - GRT 5316 - NRT 1595 - LOA 94 - Beam 26 - Depth 6.75 M - Draft 3.83 M from Black Sea to Abu Dhabi, U.A.E. |
55 days |
| 3 |
Towage of Barge 'Mahra VI' from Offshore Abu Dhabi Waters to Offshore Sir Abu Nuayr Island, U.A.E. |
6 days |
| 4 |
Towage of Barge 'GTO XXVII' - GRT 1053 - NRT 316 - Length 61.45 M - Breadth 18.29 M - Moulded Depth 3.66 M from Mumbai, India to Bahrain. |
7 days |
| 5 |
Towage of loaded Barge 'GTO 176' from Bahrain to Jubail, Saudi Arabia and back. |
6 days |
| 6 |
Towage of Vessel 'Cetus' - GRT 2299 - NRT 689 - LOA 77.00 M - Breadth Moulded 20.20 M - Depth 6.35 M - Min Draught 3.0 M - Max Draught 4.0 M from Bahrain to Singapore. |
2 months |
| 7 |
Four months charter in Malaysian Waters for barge towage account Scomi Oilserve Sdn. Bhd. with end user being TLO. |
3 months and 23 days |
| 8 |
Towage of New Build Jack-up Barge 'Kudeta 4305' - GRT 1800 tons - Length 43.00 M - Breadth 34.60 M - Draught 1.40 M from Shanghai, China to Abu Dhabi, U.A.E. Mainport. |
1 month and 26 days |
| 9 |
Three months and 15 days charter with 'J.Ray McDermott Eastern Hemisphere Ltd.' for barge towages from Jebel Ali, U.A.E. to East and West Coast India. |
3 1/2 months |
| 10 |
Four months Charter with Hyundai Heavy Industries Co. Ltd. for towing and other construction works to support Charterer's offshore project. |
In progress |
SEA BISCUIT 1
SNo |
Nature of Job |
Duration |
| 1 |
One Year and six months Charter for Anchor Handling Operations for NPCC Project in Arabian Sea and Arabian Gulf. |
In progress |
SEAWAYS 18
SNo |
Nature of Job |
Duration |
| 1 |
Towage operations between Batam, Kupang and Singapore for Offshore Marine Services |
3 months |
[
Major
Towages Undertaken | Major
Charters Undertaken | Major
Jobs Undertaken - Vesselwise ]